Difference between revisions of "Hinge Bay"
(→Documents) |
(→Type) |
||
Line 30: | Line 30: | ||
==Type== | ==Type== | ||
+ | |||
+ | The site is a steam powered sawmill and related wharf. | ||
---- | ---- | ||
+ | |||
==Team== | ==Team== | ||
Revision as of 13:53, 6 June 2008
Contents
Hinge Bay
This page is a Stub | |
Further content needs to be added. For changes please drop a note to the webmaster. |
Hinge Bay is the site of a sawmill built by the Manukau Timber Company. It operated from 1891 to 1895. There was an associated wharf and manager's house. The latter still survivies as part of an outdoors education camp. The mill was built on the water's edge and the surviving remains include the concrete pile foundations and a steam engine foundation.
There is a guided walk to the site starting at the Huia Museum. The Auckland Regional Council interpretation was undertaken by Caroline Phillips.
Summary of Manukau Timber Company Sawmill Conservation Plan
A conservation plan was prepared for the Auckland Regional Council by Garry Law, Law Associates Ltd, and John Coster, Heritage Works. G Law and J Coster 2000 Manukau Timber Company Mill, Hinge Bay, Huia (Site Q11/472) Conservation Plan. Prepared for the Auckland Regional Council, Law Associates Ltd and Heritage Works.
Location and Date
<googlemap lat="-37.007179" lon="174.563549" zoom="17"> -37.006657, 174.56416, Sawmill site -37.007539, 174.563785, Wharf site -37.007556, 174.563141, Mill manager's house</googlemap>
|
Type
The site is a steam powered sawmill and related wharf.
Team
- John Coster
- Kate Hill
Artefacts
Small Collection of artefacts- Xx.jpg
- Yy.jpg
Documents
Conservation Plan: G Law and J Coster 2000 Manukau Timber Company Mill, Hinge Bay, Huia (Site Q11/472) Conservation Plan. Prepared for the Auckland Regional Council, Law Associates Ltd and Heritage Works, (unpublished).