Difference between revisions of "Auckland Draft Unitary Plan"
Line 2: | Line 2: | ||
== Auckland Draft Unitary Plan == | == Auckland Draft Unitary Plan == | ||
[[File:Auckland_council.jpg |right]] | [[File:Auckland_council.jpg |right]] | ||
− | In March 2013 Auckland Council published a draft plan. This plan will replace the existing plans produced by the bodies that preceded | + | |
+ | === Draft Plan === | ||
+ | |||
+ | In March 2013 Auckland Council published a draft plan. This plan will replace the existing plans produced by the bodies that preceded the Auckland Council. It is the only planning document that will operate for the operation of the RMA in Auckland. | ||
This page is a temporary page to illustrate the archaeological heritage aspects of the draft plan and to enable debate on the changes proposed. | This page is a temporary page to illustrate the archaeological heritage aspects of the draft plan and to enable debate on the changes proposed. | ||
Line 15: | Line 18: | ||
The plans are here: '''http://acmaps.aucklandcouncil.govt.nz/unitaryplan/FlexViewer/index.html''' | The plans are here: '''http://acmaps.aucklandcouncil.govt.nz/unitaryplan/FlexViewer/index.html''' | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | === Overarching National Plans === | ||
+ | |||
+ | |||
+ | Some national plans exist at a higher level: | ||
+ | |||
+ | '''New Zealand Coastal Policy Statement 2010''' http://www.doc.govt.nz/publications/conservation/marine-and-coastal/new-zealand-coastal-policy-statement/new-zealand-coastal-policy-statement-2010/ | ||
+ | |||
+ | "The National Policy Statement for Freshwater Management 2011" http://www.mfe.govt.nz/rma/central/nps/freshwater-management.html | ||
+ | |||
+ | Sections of the Hauraki Gulf Marine Park Act 2000 have the status of a National Policy Statement. The Hauraki Gulf Act has coverage beyond the Council area as well. | ||
+ | |||
+ | There are also NPSs for electricity transmission and renewable electricity generation. | ||
+ | ---- | ||
+ | |||
+ | === Plans to be Superseded === | ||
+ | |||
+ | |||
+ | The plans that will be superseded include; | ||
+ | |||
+ | |||
[[Category:Auckland]][[Category:Heritage Planning]] | [[Category:Auckland]][[Category:Heritage Planning]] |
Revision as of 13:45, 20 March 2013
Contents
Auckland Draft Unitary Plan
Draft Plan
In March 2013 Auckland Council published a draft plan. This plan will replace the existing plans produced by the bodies that preceded the Auckland Council. It is the only planning document that will operate for the operation of the RMA in Auckland.
This page is a temporary page to illustrate the archaeological heritage aspects of the draft plan and to enable debate on the changes proposed.
Printed versions of the plan are rare (and very expensive) - It is described as a e-plan and realistically that is the only way to look at it.
Advice is to try to get it on two screens alongside each other - one for the maps and one for the text
The introductory page is here: http://unitaryplan.aucklandcouncil.govt.nz/pages/xc.enquire/default.aspx
The text is here: http://unitaryplan.aucklandcouncil.govt.nz/pages/plan/Book.aspx
The plans are here: http://acmaps.aucklandcouncil.govt.nz/unitaryplan/FlexViewer/index.html
Overarching National Plans
Some national plans exist at a higher level:
New Zealand Coastal Policy Statement 2010 http://www.doc.govt.nz/publications/conservation/marine-and-coastal/new-zealand-coastal-policy-statement/new-zealand-coastal-policy-statement-2010/
"The National Policy Statement for Freshwater Management 2011" http://www.mfe.govt.nz/rma/central/nps/freshwater-management.html
Sections of the Hauraki Gulf Marine Park Act 2000 have the status of a National Policy Statement. The Hauraki Gulf Act has coverage beyond the Council area as well.
There are also NPSs for electricity transmission and renewable electricity generation.
Plans to be Superseded
The plans that will be superseded include;